Union Metal Filling Station Restoration Project

Interior

These are images of the unrestored interior and the steps to being restored.

Unrestored windows

roof04
 

Unrestored windows

roof04
 

Unrestored wall panel with electric switch

roof04
 

Restored interior panels

roof04
 

Restored and unrestored interior panels

roof04
 

Tin ceiling panels removed showing furring strips and steel roof structure.

roof04
 

Unrestored tin ceiling panel.

roof04
 

Painted tin ceiling cornice

roof04
 

Painted tin ceiling panels

roof04
 

Restored tin ceiling panels going back up.

roof04
 

Restored tin ceiling panels going back up.

roof04
 

Restored tin ceiling panels and cornices installed.

roof04